Collins carried out the complete Cat B fit out to level 3 for A&M Capital in order to provide them with a larger refurbished office space. Works included new ceilings and floor finishes, both carpet and stone, a remodelled reception desk with wal…
-
Following on from the successful completion and handover of the St Francis Ward for the Hospital of St John and St Elizabeth, Collins were tasked with the refurbishment of the St Elizabeth Ward within the same building. This 13 week project took plac…
-
Collins were appointed to complete this Cat A fit out and refurbishment of 4 Farm Street, Mayfair. The works, carried out across 4 floors from basement to level 2, began with a strip out and light demolition that included the removal of the existing …
-
Working on behalf of GAW Capital this Cat A refurbishment took place on level two of 123 Buckingham Palace Road. The project began with a strip out of the existing Cat B left by previous tenants. The building floor plate was then expanded into the ex…